Infrastructure
Special finishes
Metal construction
private sector buildings
Architectural designs
government buildings
The work includes a central administrative building and 2 main warehouses. The scope of work includes supply and implementation
All construction, architectural, electromechanical, and central warehouse structures
prefabricated.
All designs and drawings for the project have also been done.
Design and construction of a building consisting of a central hall, operations department, and 12 central departments, including:
Accessories and services and contains 70 independent offices.
The scope of work includes the implementation and supply of all construction, architectural and electromechanical works
Safety, fire, and communications systems, and all interior decoration and furnishing works.
Design and construction of 2 employee lounges on the fifth floor, with the construction of a custom roof
The scope of work includes architectural design, interior finishes, decoration works, and fire systems
And electromechanical, and supplying furniture and interior accessories for rest houses
The work includes preparing, furnishing and finishing all floors and courtyards of the centre, electrical, air conditioning and mechanical works, lighting systems, automatic control systems, furnishing, floors, ceilings, walls and all finishes and installations.
Preparation, rehabilitation and furnishing of all the center’s spaces. The work includes all finishing works, electricity, air conditioning, mechanics, civil defense systems and security systems.
The work includes constructing and finishing the villas and surrounding courtyards over the entire area, and the required internal and external cladding, gardens and sidewalks. The work also includes all fences, annexes, underground tanks and swimming pools.
Land preparation and leveling, construction, foundation, and internal and external finishing works. Electricity, plumbing, air conditioning installations, tanks, annexes, fences and outdoor yards.
Design and construction of four central warehouses with an individual warehouse area of 1,200 m2 and a height of up to 7 metres.
The scope of work includes leveling the site, reclaiming the land and preparing it for the construction and finishing of warehouses from prefabricated metal structures, and even implementing all electromechanical and finishing works and flooring for high-load and heavy warehouses.
Construction and finishing of a three-story building containing 38 offices, parking lots, and the rest of the services, along with the building’s walls.
The scope of work includes implementing and supplying all structural, architectural and electromechanical works, safety, fire and communications systems, and all works for tanks, electrical rooms and transformers.